Building Infrastructure Status
Below is an index table with the current status of our building, technology infrastructure. This includes technology infrastructure systems such as door locks, video surveillance, Internet/network access and telephony.
| Building |
Status |
| Bayboro Hall |
Operational |
| Bayboro Station |
Operational |
| Campus Activities Center |
Operational |
| Children's Research Institute |
Operational |
| Chiller |
Operational |
| Coquina Hall |
Operational |
| Davis Hall |
Operational |
| Florida Center for Teachers |
Operational |
| Haney Landing |
Operational |
| KORC |
Operational |
| One Building |
Operational |
| Parking Structure |
Operational |
| Piano Man |
Operational |
| POR |
Operational |
| Poynter Library |
Operational |
| Research Labs |
Operational |
| Residence Hall One |
Operational |
| Residence Hall Two |
Offline (in planning stages) |
| Science & Technology Building |
Offline (in planning stages) |
| Snell House |
Operational |
| SVB |
Operational |
| Terrace 100 |
Operational |
| Terrace 200 |
Operational |
| Terrace 300 |
Operational |
| Terrace 400 |
Operational |
| USGS (building #3) |
Operational |
| Welcome Center |
Operational |
| Williams House |
Operational |
|